Basement April 2016
Completed ready for waterproofing
Braced house, removed basement wall and replaced with 8 inch block.
Before picture, deteriorated wall
added vertical as well as horizontal rebar with grout cells
Removal of wall
bracing of house
interior wall before
interior after
Chimney Repair 4 April 2016
Completed Chimney
Chimney Repair, replace brick and cap
before work
Stucco Mail Box April 2016
Completed work
Block mailbox covered with Stucco to match home. Stone address and cap.
Before Work
Patio and Steps Nov. 2015
Patio and steps done last fall, that I missed putting into the blog, adding in now as its a good clear image of the completed concrete patio.
Sunday, April 3, 2016
Chimney Repair 3 March2016
Chimney Repair to correct leak problem. Replace brick, cap and installed flash
Completed chimeny
Before
before
after
ing
Chimney Repair 2 March 2016
Finished Chimney
Chimney repair, same customer as white mailbox. Customer to paint brick later
Before Picture
During repair
Finished Chimney